• Disaster Mitigation Adaptation Fund – waiting for the results of the Expression of Interest.
  • DFA recovery plan – waiting on approval and implementation of the DFA recovery. Road surface repairs continue.
  • Storm system and sanitary system – preparations continue to camera the systems downtown.
  • Bank stabilization work planning continues for the unstable portion of the Kettle River in South Ruckle to protect residences against further erosion.
  • An engineering technologist was hired for 12 months and will start work late August.