• Filed applications with the DIOD (Deputy Inspector of Dikes) and Water Sustainability Act for working on the dike repairs.
  • Filed the DFA (Disaster Financial Assistance) recovery plan for City infrastructure not covered by insurance.
  • Met with City’s Insurer and discussed the overall claim.
  • Working on the Midway scope of work for repairs to their infrastructure.